contenthead8.jpg

left references

Our references

Get to know our projects and customers: We know that this can and should only be a first impression.

Therefore, please contact us for more detailed information (Contact us) and if necessary, tell we will be pleased to name people you can contact for more information from our previous clients and consultancies we have worked with.

References

[... Our references - our customers]

New build project and renovation GGS and OGS Roetgen

Technology: 750 sqm Eternit-Equitone Natura façade panels 8 mm visible mounted on aluminum substructure with insulation including connectors, such as base plates, outer and inner corners, connections to other components, etc.
Client: Roetgener Gemeindeentwicklungsgesellschaft mbH & Co. KG  
Architect/Consultant engineers: Kuper Architekten, Aachen Construction Period: 2014

Renovation of Lise-Meitner-Oberschule, Am Kieferngrund 5 in 15344 Strausberg

Technology: 1250 sqm Fundermax exterior metallic façade panels fixed visible onto aluminium substructure with insulation (thickness = 160 mm), sun protection systems and weather bowl protection
Client: Stadt Strausberg, Strausberg  
Architect/Consultant engineers: Architekturcontor Schlagemann Schulte GmbH, Potsdam Construction Period: 2012-2014

Fraunhofer-Institut für sichere Informationstechnologie SIT Darmstadt

Technology: 1800sqm modular façade system invisibly mounted on stainless steel and aluminium substructure with insulation (thickness = 180mm)
Client: Fraunhofer-Gesellschaft München  
Architect/Consultant engineers: SEHW, Berlin Construction period: 2013

Renovation office block Cecilienstraße 92 in Berlin

Technology: Eternit-Natura façade panels 8mm, 2600sqm fixed visible onto aluminium substructure with 1-layer insulation (thickness = 140 mm) including metal plate connections, window sills, jambs, lintels, attic, etc.
Client: BIM Berliner Immobilienmanagement GmbH, Berlin  
Architect/Consultant engineers: Architekturbüro Müller & Novak, Berlin
Construction period: 2013/2014

Renovation of Agentur für Arbeit in Paderborn (2nd phase)

Technology: Demolition 2300sqm modular façade system; aluminium modular façade system 3mm 2300sqm invisibly mounted on stainless steel and aluminium substructure
Client: BA Gebäude-, Bau- und Immobilienmanagement Nürnberg
Architect/Consultant engineers: Lindner Lose Architekten, Dortmund Construction period: 2013