
Our references
Get to know our projects and customers: We know that this can and should only be a first impression.
Therefore, please contact us for more detailed information (Contact us) and if necessary, tell we will be pleased to name people you can contact for more information from our previous clients and consultancies we have worked with.
References
[... Our references - our customers]
New build project and renovation GGS and OGS Roetgen
Technology: 750 sqm Eternit-Equitone Natura façade panels 8 mm visible mounted on aluminum substructure with insulation including connectors, such as base plates, outer and inner corners, connections to other components, etc. | |
Client: Roetgener Gemeindeentwicklungsgesellschaft mbH & Co. KG | |
Architect/Consultant engineers: Kuper Architekten, Aachen | Construction Period: 2014 |
Renovation of Lise-Meitner-Oberschule, Am Kieferngrund 5 in 15344 Strausberg
Technology: 1250 sqm Fundermax exterior metallic façade panels fixed visible onto aluminium substructure with insulation (thickness = 160 mm), sun protection systems and weather bowl protection | |
Client: Stadt Strausberg, Strausberg | |
Architect/Consultant engineers: Architekturcontor Schlagemann Schulte GmbH, Potsdam | Construction Period: 2012-2014 |
Fraunhofer-Institut für sichere Informationstechnologie SIT Darmstadt
Technology: 1800sqm modular façade system invisibly mounted on stainless steel and aluminium substructure with insulation (thickness = 180mm) | |
Client: Fraunhofer-Gesellschaft München | |
Architect/Consultant engineers: SEHW, Berlin | Construction period: 2013 |
Renovation office block Cecilienstraße 92 in Berlin
Technology: Eternit-Natura façade panels 8mm, 2600sqm fixed visible onto aluminium substructure with 1-layer insulation (thickness = 140 mm) including metal plate connections, window sills, jambs, lintels, attic, etc. | |
Client: BIM Berliner Immobilienmanagement GmbH, Berlin | |
Architect/Consultant engineers: Architekturbüro Müller & Novak, Berlin |
Construction period: 2013/2014 |
Renovation of Agentur für Arbeit in Paderborn (2nd phase)
Technology: Demolition 2300sqm modular façade system; aluminium modular façade system 3mm 2300sqm invisibly mounted on stainless steel and aluminium substructure | |
Client: BA Gebäude-, Bau- und Immobilienmanagement Nürnberg | |
Architect/Consultant engineers: Lindner Lose Architekten, Dortmund | Construction period: 2013 |